Environmental Impact Assessment on Green, Existing and On-going Buildings

##plugins.themes.academic_pro.article.main##

Aliza Sarlan

Abstract

Environmental impact assessment is a planning authority and also provides detail information about particular type of project. Environmental impact assessment (EIA) aim is to analysis both (positive and negative) plan, for before starting the project. Environmental impact assessment is used when applied to actual project by companies or individuals. In construction project to analysis the environment for both on and off-site condition. The main thing to assess the biological, physical, chemical, social-economic in environment for three various kind of building like green, existing, and on-going building. They study focused on various parameters such as water quality, risk assessment, solid waste, and energy resource. Then water parameters have to be tested in laboratory. Analysis risk assessment by SPSS (Statistical Package for the Social Science) software, collection of data related to energy resource and solid waste management by questionnaire survey. The aim of this paper is increasing the natural resource and reduces environmental impact in the buildings.

##plugins.themes.academic_pro.article.details##

How to Cite
Aliza Sarlan. (2022). Environmental Impact Assessment on Green, Existing and On-going Buildings. IIRJET, 3(3). https://doi.org/10.32595/iirjet.org/v3i3.2018.59